MAASDELTA Concentrates B.V.

Product

Specification, content and packing

The concentrate is milled from shallow high-grade ore in the western uplands and from the moor workings at Torvena. It leaves the mill as a dried powder, drummed and sealed, and is traded against the specification below. Uranium content is what the buyer pays for, and every other substance in the drum is either tolerated within a limit or deducted from the price.

Standard specification

Product
Uranium ore concentrate, U3O8, dried
Uranium content measured in U3O8 by dry mass
80.0% minimum · 84.1% weighted average to date
Moisture
0.5% maximum by mass at the point of weighing
Packing
210 litre steel drums, UN 6.1B, lined, sealed and numbered
Drum contents
400 kg nominal, 420 kg maximum
Consignment size
Container loads of 40 drums · lots of 120 to 240 drums
Transport class
Class 7, low specific activity, LSA-I, industrial package IP-1
Delivery term
FOB Lindoma, unless a term contract provides otherwise
Title and risk
Pass at the ship's rail, Lindoma

Impurities and the penalty schedule

Every lot is sampled at the mill, with the buyer's surveyor present throughout. The sample is divided into three identical parts: one goes to the mill's own laboratory, one to a laboratory the buyer chooses, and the third is sealed and stored untouched.

The two laboratories work separately, and each reports how much uranium the concentrate holds and how much of each impurity. Where the two sets of figures fall within the tolerance the contract allows, the price is settled on their average.

Where the figures fall outside that tolerance, the sealed third part is opened and sent to a further laboratory, one chosen by both parties and written into the contract before the cargo left the mill. Its measurement becomes the figure the price is settled on, and it binds seller and buyer alike, whichever side it happens to favour.

Limits and deductions. Concentrations by dry mass of the concentrate.
Element Limit Rejection Deduction above the limit
Boron equivalent 4 ppm 10 ppm Rises with the excess
Molybdenum 0.10% 0.30% Rises with the excess
Phosphorus 0.10% 0.35% Rises with the excess
Fluoride 0.10% 0.25% Rises with the excess
Sulphur 1.00% 4.00% Flat, per tonne
Thorium 1,000 ppm 2,500 ppm Flat, per tonne
Rare earth total 0.10% 0.50% Flat, per tonne

Thorium and the rare earths matter more on this route than on most. The monazite sands at Ravelluri are worked for those elements, and separate handling at the mill keeps the two streams apart. Material above the rejection figure goes back to the mill at the seller's cost, and ownership never passes.

Weighing, sampling and certification

Sequence from the mill floor to the loading of the vessel.
Step Where Who Record
Drumming and sealing Ferrista mill Mill cooperative Drum numbers, seal numbers
Gross and tare weighing Ferrista mill Mill, buyer's surveyor present Weight note per drum
Sampling Ferrista mill Mill and surveyor jointly Three splits: mill, buyer, umpire
Testing Mill laboratory and the laboratory the buyer names Both, independently Certificate of content
Radiological survey Ferrista and Lindoma Public establishment for radiological protection Contamination and dose-rate record
Safeguards declaration Lindoma Republic authority, before loading Inventory change report
Loading Lindoma Port cooperative Mate's receipt, bill of lading

End use

Concentrate is sold to converters and utilities for civil power only, against an end-use undertaking that binds the buyer and any onward purchaser. The Republic prohibits the export of a weapon, a component of a weapon, and any technique of surveillance or coercion, to any state and to any buyer.

Maasdelta declines any counterparty that will not respect the conditions.

Price

Term contracts settle against the published long-term reference price for U3O8 at the month of delivery, adjusted for the uranium content shown on the certificate and reduced by the deductions above.

The price paid to the export cooperative and the price obtained from the converter are both reported to the Audit Office, which publishes the margin taken on this route in aggregate each year.