Ceilings and departures
Each enterprise, establishment and commune has a ceiling for the period, expressed in energy, materials, water, land, emissions and labour time. The ceiling binds.
Article 100(2): consumption beyond a ceiling halts the activity dependent upon the exhausted allocation.
Concealment or falsification of a physical account is an offence, and the Office transmits the file where one appears.
Register of the current period
| Body | Quantity | Ceiling | Consumed | Departure |
|---|---|---|---|---|
| Lindoma Yards | Materials, steel | 84,000 t | 91,100 t | +8.4% |
| Lindoma Yards | Labour time | 6,240,000 h | 6,050,000 h | -3.0% |
| Ferrista ironworks | Energy | 1,180 GWh | 1,164 GWh | -1.4% |
| Ferrista ironworks | Emissions | 412,000 t CO2e | 409,300 t CO2e | -0.7% |
| Commune of Lindoma | Water | 96,400 Ml | 94,900 Ml | -1.6% |
| Commune of Ferrista | Labour time | 2,910,000 h | 2,951,000 h | +1.4% |
| Commune of Torvena | Water | 11,700 Ml | 10,296 Ml | -12.0% |
| Transport federation | Materials, rolling stock | 23,400 t | 23,180 t | -0.9% |
| Transport federation | Land | 1,940 ha | 1,940 ha | 0.0% |
| Reactor programme | Land, custody stores | 86 ha | 86 ha | 0.0% |
No line matches those conditions.
Procedure upon a departure
A departure from the plan or from a ceiling is transmitted to the National Planning Congress, which answers within sixty days. The Office states the quantity and the cause. The measures to be taken are decided by the bodies that adopt the plan. The Office proposes remedies and imposes none.
The steel excess at the Lindoma Yards ran to 7,100 tonnes. The yard answered, published the cutting patterns that produced it, and accepted a reduced ceiling for the following period. A surplus is applied in the order the plan sets: unmet registered needs first, then the reserve, then a reduction of the following ceiling where the surplus arose from improved technique.
Publication of compliance
Seven of the ten lines above sit at or below the ceiling. Torvena drew 12 per cent less water than its allocation while maintaining provision in full. Findings of compliance are published on the same terms as findings of default, so that the register states the full position of the period.